​​​​To further transparency and openness in its implementation of the National Environmental Policy Act (NEPA) process, the Presidio Trust documents its Categorical Exclusion (CE) determinations involving the categories of actions identified in Section 1010.7 of the Trust’s NEPA regulations. The CE database may be searched by planning district, project type, CE applied, or the year initiated.​​ The database is updated approximately monthly. For additional information on the Trust’s NEPA compliance program, email N2@presidiotrust.gov.
 
If you encounter an error loading this page, please refresh your browser.
 ​
  
  
  
  
  
  
Project Description
Project Number19-051
Project NameBuilding 37 Repair and Tenant Improvements
Planning DistrictMain Post
Project TypeRehabilitation/TI
CE AppliedRehabilitation or improvement of historic properties
CE Date7/15/2019
Project Description
The Trust is completing limited repairs and improvements to the Graham Street and central wings of historic building 37 (Administration Building, 1941) to accommodate a change in tenancy and lease renewal. Along the rear façade of the building, some of the non-historic aluminum windows on the second floor will be replaced with replica wood windows. New lighting, flooring, carpeting, and painting will be completed on the first and second floors in phases to accommodate tenant’s relocation. One partition wall on the first floor will be replaced with storefront assembly. Two new office spaces will be created on the second floor with partition wall and glass doors. No alterations are planned for the Keyes Street wing.
 
Project Number19-052
Project NameBuilding 103 Department and Staff Relocation
Planning DistrictMain Post
Project TypeMaintenance
CE AppliedRoutine and continuing government business
CE Date7/15/2019
Project Description
The Trust will make a number of improvements to accommodate the relocation of departments and staff throughout historic building 103 (Two Company Barracks, 1896). Some office furniture will be moved and new workstations will be added. Non-historic glass storefronts will be removed from two office spaces on the second floor. The north gallery will receive acoustic ceiling tiles and electrical and data will be extended for new work spaces. A mobile phone booth will be added in the first floor north wing. A security camera will be installed at the entrance of the south wing for IT.
 
Project Number19-045
Project NamePresidio Hills Tree Removal and Habitat Restoration
Planning DistrictPHSH
Project TypeVegetation Restoration
CE AppliedRemoval of non-historic materials and structures
CE Date7/10/2019
Project Description
A rapidly declining stand of approximately 190 large, over-mature Monterey pine trees exists on roughly three acres immediately north of The Presidio Landmark (building 1801) in the Public Health Service district. Removal of these trees is a high priority and will be conducted as soon as practicable. A third-party contractor will remove the trees over a one-month period. Contractor equipment will include log trucks, yarding equipment, off-road cranes, chippers and chainsaws. Salvageable chips and saw logs will be transported to the Trust log yard; other materials will be off-hauled. A landing site will be created just south of building 1818 to stage equipment and material. Following tree removal, the sand slope will be inverted with heavy machinery to bury hydrophobic sand and place weed-free, well-draining sand on the surface. The site will be replanted over a three-year period with oak woodland and coastal dune scrub annual and perennial species including the federally endangered San Francisco lessingia (Lessingia germanorum). Extant coast live oaks trees will be protected in place and will be integrated into future revegetation.
 
Project Number19-046
Project NameBuilding 1328 Roof Replacement
Planning DistrictFort Scott
Project TypeMaintenance
CE AppliedRoutine maintenance and property and resource management
CE Date6/24/2019
Project Description
The roof of building 1328 (Officers' Quarters, 1912) and its rear porch leak and will be replaced in-kind. Roofing tiles will be removed and reinstalled where possible. New or salvage tiles that match existing will be used as needed. New copper flashing and copper gutters will be installed and any dry rot will be repaired. The rear porch area roof composition shingles will be replaced with similar composition shingles. Staging area will be limited to paved areas around the building.
 
Project Number19-047
Project NameRepair and Improvement of Building 97
Planning DistrictMain Post
Project TypeRehabilitation/TI
CE AppliedRehabilitation or improvement of historic properties
CE Date6/24/2019
Project Description
Following a recent tenant turnover, the Trust will make minor improvements and repairs to historic building 97 (Red Cross Building, 1942). Work includes patching, painting, electrical, plumbing and carpentry preventive maintenance. Four non-historic aluminum sliding windows will be replaced with replica wood windows on the south façade of the building. A wooden Red Cross sign that previously hung at the entrance of the building will be installed inside the building.
 
Project Number19-048
Project NameBuilding 731B Seismic, Bathroom and Kitchen Improvements
Planning DistrictEast Housing
Project TypeRehabilitation/TI
CE AppliedRehabilitation or improvement of historic properties
CE Date6/24/2019
Project Description
After a long tenancy, building 731 (Officers’ Quarters, 1933) is vacant and in need of limited seismic upgrades and kitchen and bathroom improvements. Seismic work will include strapping first floor joists to the brick, strapping the ceiling joists to the brick, and bolting the rim joist in attic to the exterior wall and plywood ceiling joist in the attic. The electrical sub panel and distribution wiring will be replaced. New copper plumbing, drain lines, and venting will be installed and the boiler will be upgraded. All windows and hardwood floors will be repaired. The kitchen will be upgraded with new cabinets and appliances. Bathroom tiles will be repaired and the tub will be refinished.
 
Project Number19-049
Project NameBuilding 220 Bathroom Improvements
Planning DistrictMain Post
Project TypeRehabilitation/TI
CE AppliedRehabilitation or improvement of historic properties
CE Date6/24/2019
Project Description
Men’s and women’s restrooms in historic building 220 (Bakers and Cooks School and Barracks, 1939) will be updated to serve current users. New sinks, fixtures, mirrors and lighting will be installed in two women’s and two men’s restrooms on the first and second floors. Dividers will be painted and dispensers will be replaced with plastic dispensers. Historic tile and marble partitions will be retained. Metal kick plates will be installed on doors.
 
Project Number19-036
Project NamePark Stand Phase IV Reforestation
Planning DistrictSouth Hills
Project TypeTrees
CE AppliedRemoval of non-threatened or endangered species
CE Date6/19/2019
Project Description
The Park Stand occurring within the broad loop of Park Boulevard west of the National Cemetery is one of the key historic forest stands in the Presidio. The Monterey cypress trees within the stand have unusual visual quality and provide an important visual barrier to the National Cemetery. However, trees in the stand are characterized with a very low percentage of live crowns, limiting the vigor of the old trees, which have now reached a state of over maturity. This fourth phase of the six-phase project will remove and restore approximately 70 rapidly declining Monterey cypress trees on 0.96 acres just north of the Phase III reforestation effort (project 18-033). Stumps will be ground, and approximately 400 yards of Trust compost will be applied prior to installing a drip irrigation system. Approximately 200 Monterey cypress trees will be planted. Trees will be established over a five- to eight-year period with subsequent thinning to arrive at 30 to 50 trees per acre. As with the other phases, removal of the existing trees and the replanting and early management of the replacement stand will follow Dr. Joe McBride’s recommendations. The Park Boulevard Trail through the area will be intermittently closed for public safety during tree removal.
 
Project Number19-037
Project NameArguello Stand 7 Reforestation
Planning DistrictSouth Hills
Project TypeTrees
CE AppliedRemoval of non-threatened or endangered species
CE Date6/19/2019
Project Description
Trees within the 0.9-acre Arguello 7 Stand next to the Spire landmark sculpture and bordering the Bay Area Ridge Trail exhibit characteristics similar to other conifers within the historic forest: overly dense and over mature, displaying poor and unstable structure. This project will remove approximately 100 Monterey cypress trees, much of which will be salvaged, milled and used as site furnishings at the Tunnel Tops. After the stumps are ground and the site prepped, approximately 500 yards of compost will be applied and a drip irrigation system will be installed. Roughly 200 Monterey cypress seedlings will be replanted, maintained, and periodically thinned to arrive at 30 to 50 trees per acre when mature after ten years. All brush and material not sized for sawlogs will be chipped on site. The Bay Area Ridge Trail will be closed intermittently during tree removal and protected with appropriate measures where necessary.
 
Project Number19-038
Project NameWashington Stand Phase II Reforestation
Planning DistrictSouth Hills
Project TypeTrees
CE AppliedRemoval of non-threatened or endangered species
CE Date6/19/2019
Project Description
The second phase of Washington Stand reforestation will remove invasive, non-native species and replant with mixed conifer tree species on less than 0.5 acres along Washington Boulevard between the road and the Bay Area Ridge Trail. The site currently consists of lower growing acacias, which will be removed with stumps and roots pulled from the ground to prevent resprouting. All material will be chipped and hauled to the Trust’s log yard. Roughly 100 yards of Trust compost will be applied as soil amendment, and a drip irrigation system will be installed for establishing the tree seedlings. The site will be maintained for approximately eight to ten years before periodically being thinned to arrive at 30 to 50 trees per acre when mature. The Bay Area Ridge Trail will be closed intermittently during tree removal and protected with appropriate measures where necessary.
 