Riley Neighborhood Remediation Documents A- Electronic message to Riley Avenue residents 4-12-18 B- EPA-Near Roadway Air Pollution and Health - August 2014 C- ATSDR Public Health Statement - Benzene factsheet - August 2007 D- Electronic message to Riley Avenue residents 4-20-18 E- Table 1 Sub-Slab and Soil Vapor Analytical Results F- Table 2 Indoor and Ambient-Outdoor Air Analytical Results G- PowerPoint - Riley Avenue Fuel Distribution System Investigation Update 5-17-2018 H- Updated Table 1 Sub-Slab and Vapor Analytical Results 11-14-18 I- Updated Table 2 Indoor and Ambient-Outdoor Air Analytical Results 11-14-18 J- Revised Feasibility Study and Corrective Action Plan (FS/CAP) 1-17-2020 K- Regional Water Quality Control Board (RWQCB) Approval Letter 1-24-2020 L- Revised Section BR11-1 Supplemental Site Investigation Report 8-2-19 M- Site-Specific Land Use Control (LUC) Addendum 4-28-2020 N- RWQCB Approval Letter of LUC Addendum 5-6-2020 O- RWQCB issued Determinations of No Unacceptable Risk to Human Health from Soil Vapor Intrusion for: Units 128B and 129A 6-22-18 Units 128A and 129B 8-16-18 Unit 127A 10-24-18 Unit 127B 12-13-19 P- Construction Completion Report (CCR) Vapor Mitigation System for Unit 127B 8-30-19 Q- RWQCB approval letter for CCR 10-9-19 R- Riley Avenue Disclosure S- RWQCB to Trust Concurrence with Revised OMMP T- Revised Riley VMS CAP OMMP U – No Further Action and Discontinuation of Groundwater Monitoring at FDS Section BR11-1 NFA Letter dated 6-8-22 Attachment – Case Closure Summary A- Electronic message to Riley Avenue residents 4-12-18B- EPA-Near Roadway Air Pollution and Health - August 2014C- ATSDR Public Health Statement - Benzene factsheet - August 2007D- Electronic message to Riley Avenue residents 4-20-18E- Table 1 Sub-Slab and Soil Vapor Analytical ResultsF- Table 2 Indoor and Ambient-Outdoor Air Analytical ResultsG- PowerPoint - Riley Avenue Fuel Distribution System Investigation Update 5-17-2018H- Updated Table 1 Sub-Slab and Vapor Analytical Results 11-14-18I- Updated Table 2 Indoor and Ambient-Outdoor Air Analytical Results 11-14-18J- Revised Feasibility Study and Corrective Action Plan (FS/CAP) 1-17-2020K- Regional Water Quality Control Board (RWQCB) Approval Letter 1-24-2020L- Revised Section BR11-1 Supplemental Site Investigation Report 8-2-19M- Site-Specific Land Use Control (LUC) Addendum 4-28-2020N- RWQCB Approval Letter of LUC Addendum 5-6-2020 O- RWQCB issued Determinations of No Unacceptable Risk to Human Health from Soil Vapor Intrusion for:Units 128B and 129A 6-22-18Units 128A and 129B 8-16-18Unit 127A 10-24-18Unit 127B 12-13-19 Page Content